Hot Water Distribution for Solar Technology

Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

Case Study Nº

114

Customer

Raygen
Australia

|

2021

Working Conditions

Pressure: 4 bars | Temperature: up to 90°C / 194°F

Pexgol Pipes

Pexgol 200 (8″), Class 12

Application

Hot water distribution

Lenght

2160 m / 7086 ft

Categories

Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

The Challenge

RayGen is an Australian technology company with world-leading breakthroughs in solar power technology and renewable energy storage.

They required to provide cooling water to their concentrated solar towers. Then the water needed to return from the towers at 90°C to the thermal storage.

Pexgol Solution

The client decided to install a Pexgol system (pipe and fittings) for it’s operation, after considering the following benefits:

  • Corrosion resistance at elevated temperature without the need for coatings (compared to metallic piping).
  • Ease of installation due to long coil lengths reducing welding/connections and flexibility (compared to metallic and other rigid 6-12 m pipe lengths).
  • Low thermal expansion forces allowing direct burying without the need for extra expansion allowance (compared to metallic piping) Pexgol natural bending radius – Using the natural bending capabilities allowed reducing connections, parts and pressure drop.

The pipes were installed under ground without special pipe protection and were insulated using PIR foam sprayed directly around the pipes, after pressure testing. Then backfilled directly on top.
Special Reinforced EF Couplers Series 2 (up to 90ºC) were welded.

Related Case Studies

Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Fiber Optic Cables Through a Vertical Shaft

Sinohydro
Israel

 | 

2021
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019