From carbon steel to Pexgol: A victory against corrosion

Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

Case Study Nº

133

Customer

Profertil
Argentina

|

2021

Working Conditions

Ambient temperature | Pressure: 10 kg/cm2

Pexgol Pipes

Pexgol 63, 180, 225, 250 & 250 mm, class 15

Application

Fire Protection Network

Lenght

2000 m / 6562 ft

Categories

From carbon steel to Pexgol: A victory against corrosion

The Challenge

Profertil, a leading producer and supplier of soil nutrients with an annual production capacity of 1,320,000 tons of Urea and 790,000 tons of ammonia, faced a critical challenge at their Bahia Blanca facility in Argentina in 2021. The fire protection network in their plant, originally made from carbon steel, was highly susceptible to corrosion due to two distinct factors: the hardness of the water running through the pipes, causing internal corrosion, and the high salt content in the coastal soil, inducing external corrosion. This corrosion was causing leaks in the pipes, compromising the effectiveness of their crucial fire protection network.

Pexgol Solution

Pexgol provided an effective and efficient solution to Profertil’s problem with its range of corrosion-resistant PE-X pipes. Pexgol pipes of various sizes (63, 180, 225, 250, and 280 mm) were used to replace the 2000 meters (6562 feet) of the existing fire protection network.

Pexgol’s fusion couplers, flange couplers, PE-X coated fittings, Pexgol reducers, Pexgol elbows, and fire hydrant connectors were used in the installation process. The installation was smooth and straightforward, thanks to Pexgol’s flexible material that offers rapid installation and reliability, a major advantage over the previous carbon steel system.

The local team, ArgPex, provided ongoing support throughout all stages of the project, from engineering and logistics to installation and commissioning, ensuring that the customer was well-guided and supported throughout the entire process.

Opting for Pexgol’s solution not only provided a system resistant to the corrosive effects of hard water and salty soil, but also a solution with a longer life span and fewer interferences within the plant, due to the flexibility and durability of Pexgol pipes. This successful replacement has set a new standard for Profertil’s operations, highlighting the effectiveness of Pexgol’s innovative approach to corrosion-resistant pipe systems.

Related Case Studies

Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Moving from PVC to Pexgol: Ensuring Efficiency in Lithium Production

Optimization of Lithium Brine Transportation

Puna Mining
Argentina

 | 

2022
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022