Skip to content

Formation Water Transport

Transport of Formation Water with Hydrocarbons.

Case Study Nº

55

Customer

ROCH
Argentina

|

2015

Working Conditions

Formation water with traces of hydrocarbons at 40°C, ambient temperature from -10°C to 30°C

Pexgol Pipes

Pexgol 110 mm (4”), Class 12

Application

Formation Water Transport

Lenght

4000 m

Categories

Transport of Formation Water with Hydrocarbons.

The Challenge

ROCH is a private company dedicated to the exploration and exploitation of hydrocarbons. As part of their production plans, it was necessary to produce and treat formation water which will then be injected through injection wells for secondary recovery. The purpose of secondary recovery is to maintain reservoir pressure and facilitate the displacement of hydrocarbons to the HC producing well.

The specific challenge was not only to find a pipe material that could support the composition of the fluid, but also to solve the following situations:

– Both the workforce and the heavy equipment, in Santa Cruz (Argentina), are very expensive and represent a very significant portion of the total cost of putting a line of production to work.

– The line had to cross a field belonging to the businessman Benetton, in which sheep are raised to produce wool that is used for his clothes business. Benetton did not allow trenches to remain open during the night (for fear that the animals could fall inside). This situtation, forced to work on sections, opening the trench, installing the pipeline and refilling the trench on the same day.

The pipe options that were handled were steel, HDPE and PE-X.

Pexgol Solution

ROCH decided to install PE-X.

With Pexgol the installation cost dropped drastically reducing the number of operators and their qualifications (no need for professional welders).

In addition, the equipment for the laying of the pipeline is light and not very sophisticated: only a backhoe is used. When installing steel pipes, for example, special equipment must be used.

Furthermore, not only allowed to make a much faster installation, but installation could also be carried out with fewer joints. Both the steel and the HDPE would have required 333 connections and with Pexgol only 13 were eventually needed. This saved costs, labor and time.

The installation was quick and easy despite the harsh weather conditions, and did not require any special tools or equipment.

Regarding the problem of the trenches, Pexgol turned out to be the ideal solution due to the ease and rapidity of laying many meters of pipe in a short time (due to its presentation in rolls).

Related Case Studies

Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018
Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022
Installation of Pexgol Pipes to Transport Fish.

Fish Discharge Lines

TASA
Peru

 | 

2018

Categories: