Skip to content

Fluorosilicic Acid Transport

Pexgol Pipe for the Transport of Fluorosilicic Acid.

Case Study Nº

70

Customer

Phosphate Mine – ICL Rotem
Israel

|

1995

Working Conditions

Pressure: 5 bar / Temperature: 60°C

Pexgol Pipes

Pexgol 250 mm, Class 10 | Pexgol 280 mm, Class 10 | Pexgol 315 mm, Class 10

Application

Acid transport

Lenght

Systems made up of hundreds of meters with elbows, tees and branches.

Categories

Pexgol Pipe for the Transport of Fluorosilicic Acid.

The Challenge

From the beginning ICL Rotem used HDPE, 316 stainless steel and rubberized steel pipes for the transport of fluorosilicic acid. Beyond the costly installation, the tubes suffered from corrosion and wear, forcing maintenance workers to replace the tubes every 5 to 9 months, and on several occasions to stop production altogether.

Pexgol Solution

  • • In the first instance, PE-X test tubes were placed in the fluid to be transported. Once the laboratories certified that the acid did not carry out any chemical attack on the tubes, 12 meter pipe sections were installed with electrofusion couplings.
  • Since then, in 1995 till today thousands of meters have been installed transporting fluorosilicic acid without having to replace the tubes or have to carry out any maintenance.
  • The resistance to high temperatures, abrasion and chemical attacks caused the maintenance costs in the process plant to be significantly reduced and the investment amounts to be reduced in new plant expansion projects.

Related Case Studies

Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987
Transforming water transportation with Pexgol technology

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Comisión Federal de Electricidad
Mexico

 | 

2023
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Safety and durability: The heart of our solutions

Minera Fresnillo
Mexico

 | 

2021