Efficient Implementation of NaOH Drainage Systems

Profertil and the Adaptation to New Chemical Processes with Pexgol.

Case Study Nº

161

Customer

Pluspetrol
Argentina

|

2023

Working Conditions

Temperature: Ambient | Pressure: Atmospheric | Flow Rate: 50 liters/hour | Fluid Components: 50% Sodium Hydroxide

Pexgol Pipes

Pexgol 160 mm, class 15

Application

Sodium Hydroxide Discharge

Lenght

10 m / 32 ft

Categories

Efficient Implementation of NaOH Drainage Systems

The Challenge

Profertil, a leading company in the production and commercialization of soil nutrients in Argentina, faced a significant challenge at its plant. With the recent modification of their processes to include the discharge of 50% sodium hydroxide (NaOH), it became imperative to develop suitable infrastructure to handle this highly corrosive chemical.

The original unloading system was not designed for NaOH, necessitating the creation of a completely new system capable of handling the unique specifications of this chemical.

The Solution

Profertil decided to implement a solution using a 10-meter Pexgol pipe, leveraging pipes that the company had already acquired for another project. Pexgol was chosen due to its high resistance to chemicals, durability against corrosion,
and ease of handling and installation. The project involved excavation and civil works necessary to install and connect the new piping to the collection chambers, followed by paving the surface to ensure the system’s integrity.

The installation of the Pexgol pipe was successfully completed, connecting the collection chambers in the truck unloading area. This system now efficiently handles the excess NaOH and wash water, combining and draining them without incidents. Since its commissioning four months ago, the infrastructure has operated without issues, demonstrating Pexgol’s ability to adapt to Profertil’s specific industrial chemical handling needs.

The client, Profertil, expressed satisfaction with the versatility and effectiveness of the solutions provided by Pexgol, highlighting the quick installation and reduced risks associated with handling corrosive substances.

Related Case Studies

Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Hot Caustic Line Replacement in Paper Mill

Pulp & Paper Mill

Svetlogorskiy Mill
Russia

 | 

2015