Biodiesel Transport

Biodiesel Transport through the Colombian Jungle

Case Study Nº

56

Customer

Indupalma (Oro Rojo Plant)
Colombia

|

2012

Working Conditions

Temperature: Fluid at 95°C Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 24

Application

Biodiesel Transport

Lenght

450 m

Categories

Biodiesel Transport through the Colombian Jungle

The Challenge

Indupalma is a company that produces palm oil and its derivatives. One of the most common uses of palm oil is for the production of biodiesel. Initially, Indupalma used asbestos pipes for transporting biodiesel, which were later replaced by CPCV SCH 80 pipes. Neither of these materials was resistant to abrasion and the high temperatures of the fluid. Moreover, due to the jungle terrain (where there are constant rains and landslides), these pipes often broke completely due to the movement of rocks and trees. This situation caused losses for the company, not only due to production stoppages and the constant need to replace the pipes, but also because of spills that had environmental consequences.

The Solution

After witnessing the poor performance of these pipe materials, Indupalma decided to look for a new pipe material that could withstand impact, chemical resistance, and high temperatures to transport the fluid. They ultimately chose Pexgol pipes, which met all these requirements.

Related Case Studies

Replacement of Carbon Steel Pipe for a Pexgol Pipe

Water Transportation

Cargill
Mexico

 | 

2017
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019