Transportation of sodium sulfide

Pvc Pipe Replacement by Pexgol

Case Study Nº

44

Customer

Magnelec S.A. de C.V.
Mexico

|

2018

Working Conditions

Pressure 60 psi; Temperature 60° to 80°C; Highly Corrosive Liquid

Pexgol Pipes

Pexgol 225×20.4 SDR 15

Application

Sodium Sulfide Transportation

Lenght

600 meters

Categories

Pvc Pipe Replacement by Pexgol

The Challenge

Magnelec had installed a Yellomine pipe (PVC pressure pipe) where it was transporting sodium sulfide.
Due to changes in temperature in the fluid, dilatation and contraction of the pipe was frequent issue. The pipe was installed in sections of 6 metersc each, generating leaks in the joints, which caused a lot of losses in the line of conduction. Also, there were problems in the stainless steel pipes with leaks in the joints of the welds.

Pexgol Solution

Due to this frequent problems, Magnelec decided to replace its pipes with Pexgol. Once the Yellomine pipes were replaced by Pexgol pipes, the problem of leakage was solved, thanks to the fact that Pexgol pipes were supplied in rolls of great lengths, which decreased the number of joints. The material of Pexgol pipes is flexible and absorbs the movements that can be generated by changes in temperature.
They are also highly resistant to corrosion and to high and low temperatures, so it was the ideal solution.
The installation was quick and easy in sections of 200 meters in length with mechanical GP connections. The installation took around 7 days. The tools used were tightening wrenches, slings, crane, etc.

Related Case Studies

Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995
Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

Free Chlorine Potable Water Supply

Rabin Medical Center
Israel

 | 

2020
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015
Installation of Pexgol Pipes for Drainage in a Vertical Ground

Vertical Dewatering

Ferrexpo Poltava Mining
Ukraine

 | 

2019
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016