Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

Case Study Nº

94

Customer

Rabin Medical Center
Israel

|

2020

Working Conditions

Temperature: 4° to 85°C | Pressure: 6 bar

Pexgol Pipes

Pexgol CL+ 16 mm – 75 mm class 24

Application

Free Chlorine Potable Water Supply

Lenght

1000 m

Categories

Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

The Challenge

As one of the most major and central medical institutions in Israel, “Rabin Medical Center” must meet the most severe international health standards. Free Chlorine, if used to sterilize a potable water supply, may lead to Chlorine corrosion, and could even rupture pipes and infrastructure. As little as 0.3 ppm of Chlorine in the water system will lead to high wear and degradation and necessitate frequent replacements.

Pexgol Solution

Pexgol CL+ has proven durability to free Chlorine in a concentration between 0.3-0.5 ppm and working pressures up to 6 bar. By installing Pexgol CL+ in a potable water system, “Rabin Medical Center” can continue to insure a clean and safe supply of water to the hospital.

Related Case Studies

Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Transportation of Water with Solids

Kofanor
Mexico

 | 

2022
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 