Successful outcome in pilot test for SCT Discharge Line with Pexgol.

Case Study Nº

157

Customer

Barrick Gold
Dominican Republic

|

2023

Working Conditions

Temperature: 65°C / 149°F | Flow: 250 m³/h | Pressure: 7 bar

Pexgol Pipes

Pexgol 315 mm, Class 12

Application

SCT discharge line in cooling towers

Lenght

35 m / 114 ft

Categories

Advanced piping solutions for handlingscaling fluids

The Challenge

Barrick Gold Corporation, at its Pueblo Viejo mining unit, faced a significant challenge in its operation. The company was using 12” SCH 40 carbon steel pipes for the transportation of slurry with lime sludge in its SCT discharge line at the cooling towers. This method presented several problems, primarily due to its chemical composition, the fluid was highly scaling. The scale reduced the inner diameter of the pipes by 30% to 40% over an approximate three-month period, severely affecting performance and increasing the energy consumption of the pumping system. Additionally, maintenance required dismantling the lines, cleaning them with high-pressure equipment, and a team of 10 operators for about two weeks, resulting in high operational and maintenance costs.

The Solution

In search of an innovative solution, Barrick Pueblo Viejo opted to implement 315 mm Class 12 Pexgol pipes, with a length of 35 meters for a pilot test. Pexgol piping, known for its high resistance to abrasion, corrosion, and scaling, was presented as the alternative for this challenging environment. Three-meter sections of the pipe were flown in, and connections were made using electrofusion couplings and flanged couplings for integration into the existing system through flanged joints.

The installation was completed in approximately one day, including the training of staff for field welding. This rapid installation minimized interruptions in the operations of Barrick Pueblo Viejo, allowing for a smooth transition to the new piping system.

Since the implementation of Pexgol, scaling has significantly decreased. The pipes have been operating for 9 months without signs of scaling, resulting in a significant reduction in operational and maintenance costs. The total changeover of the existing line can generate savings of 200,000 USD per year in maintenance.

Related Case Studies

Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
High Pressure Water Transport for a Gold Mine.

High Pressure Water Transport

Mansfield Mine
Argentina

 | 

2019
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016