Skip to content

Free Chlorine Potable Water Supply

Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

Case Study Nº

94

Customer

Rabin Medical Center
Israel

|

2020

Working Conditions

Temperature: 4° to 85°C | Pressure: 6 bar

Pexgol Pipes

Pexgol CL+ 16 mm – 75 mm class 24

Application

Free Chlorine Potable Water Supply

Lenght

1000 m

Categories

Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

The Challenge

As one of the most major and central medical institutions in Israel, “Rabin Medical Center” must meet the most severe international health standards. Free Chlorine, if used to sterilize a potable water supply, may lead to Chlorine corrosion, and could even rupture pipes and infrastructure. As little as 0.3 ppm of Chlorine in the water system will lead to high wear and degradation and necessitate frequent replacements.

Pexgol Solution

Pexgol CL+ has proven durability to free Chlorine in a concentration between 0.3-0.5 ppm and working pressures up to 6 bar. By installing Pexgol CL+ in a potable water system, “Rabin Medical Center” can continue to insure a clean and safe supply of water to the hospital.

Related Case Studies

Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Hot Caustic Line Replacement in Paper Mill

Pulp & Paper Mill

Svetlogorskiy Mill
Russia

 | 

2015
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Potable Water Supply on Harsh Terrain

Potable Water Supply on Harsh Terrain

Mekorot / Beit Shemesh Water Company
Israel

 | 

2017
Grey Water Transportation

Recovered Water Transportation

Coeur Mexicana S.A. de C.V. Palmarejo
Mexico

 | 

2017