Dewatering Through Shafts

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Case Study Nº

81

Customer

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

|

2019

Working Conditions

Pressure: 20 bars | Ambient temperature

Pexgol Pipes

Pexgol 160 mm (6”), class 24

Application

Dewatering

Lenght

350 m / 1148.29 ft

Categories

Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

The Challenge

Esan had to pump dirty water from -600 meters at their underground lead-zinc mine, through narrow shafts to upper levels of the mine.

They usually used HDPE and steel pipes but they had clogging problems. This time Esan wanted a pipe that will not clog and will be very easy to install, with no need of fittings installed in the narrow shafts. They tried to find alternatives to prevent leakege problems on the fittings that caused to change them many times.

Pexgol Solution

The client decided to install 350 meters of Pexgol pipe. They choose Pexgol due to it’s experience with providing long pipe sections that enable to avoid installing fittings in narrow shafts and because of the resistance of the pipe to scale build up.

Thanks to Pexgol the installation took just 6 hours, Esan reduced their operation downtime.

Esan built their own decoiler and decoiled the pipe by themselves.

Related Case Studies

Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016
Water line feed from wells to mine

Mine Dewatering – High Pressure Conditions

Antofagasta Minerals, Michilla Mine
Chile

 | 

2011
Transport of Muddy Water (Pome) witha High Content of Organic Load.

Transport of Muddy Water in a Palm Oil Processing Plant

La Gloria
Colombia

 | 

2020