Potable Water Supply on Harsh Terrain

Case Study Nº

48

Customer

Mekorot / Beit Shemesh Water Company
Israel

|

2017

Working Conditions

High pressure (12 bar), possible water hammers & complicate terrain.

Pexgol Pipes

Pexgol 630 mm, Class 15

Application

Drinking Water Transportation

Lenght

1.3 km

Categories

Potable Water Supply on Harsh Terrain

The Challenge

The Municipal Water Company of Beit Shemesh (Israel) in cooperation with the Ministry of Construction and Housing of Israel required to install a main potable water supply line from Mekorot to the city of Beit Shemesh. The line brought high pressure water from Mekorot, and goes along a national route to a reservoir that supplies drinking water to thousands of housing units in the developing Ramat Beit Shemesh area.

The line connecting the Mekorot station to the water reservoir runs along a very complex rocky road characterized by many twists and turns, within a forested path protected by the authorities, at altitudes close to 100 meters, and ancient areas that are forbidden to be excavated.

To implement the project, it was required a pipeline that could cope with a combination of high pressures, a very dynamic pressure regime and to be suitable for transportation and installation under very aggressive conditions.

In addition, the pipe line needed to be anti-static and / or a pipe made of insulating material that would be impervious to electric shocks since a parallel pipe line was placed with power lines.

Pexgol Solution

The outstanding capabilities of Pexgol pipes led to the selection of this reliable system for the installation.

To meet the strictest standards in terms of quality, safety and preservation of the environment a Pexgol pipe line of 1.3 km was installed. The installation was done 15 meters underground in a very harsh environment that required constant dragging of the pipe.

The natural bending radius of the pipes were key to the success of this project. Furthermore, the line was capable of supporting water hammers caused by the pumping from the Water Company.

Additionally a 200 meters section was installed by horizontal drilling inside an existing steel pipe line. The Pexgol pipe section for this part was cover with plastic spacers to separate it from the current pipe.

Overall the installation took 20 days without any special equipment. With other pipe materials such as PE, it could take 3 or 4 times more since extreme precautions needed to be done to avoid damaging the pipes and connecting between sections on this harsh terrain.

Related Case Studies

Installation of Pexgol Pipes for a Compress Air System.

Compressed Air System

Rav-Gon Printing House
Israel

 | 

2020
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
Installation of Pexgol Pipe for a Intake Line to Transport Hot Abrasive Brine Slurries

Hot & Abrasive Potash Brine Processing

Fertilizer Company
Canada

 | 

2017
Work with High Pressures and Extreme Ambient Temperature

Water Transport in Copper Mine

Zaldivar SPA Mine
Chile

 | 

2018
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018