Skip to content

Sewage Water Transportation

Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Case Study Nº

47

Customer

BorsodChem
Hungary

|

2011

Working Conditions

Extreme corrosion

Pexgol Pipes

Pexgol 200 mm Pexgol. Prefabricated Elbows 200 mm

Application

Sewage Transportation

Lenght

n/a

Categories

Sewage Water Transportation With 300 Ppm Hydrogen Peroxide

The Challenge

BorsodChem requiered to transport sewage water with 300 ppm hydrogen peroxide for a medium of manufacturing procedure of
car-spareparts. The client has tested di erent pipe material such as HDPE, steel and ductile cast iron (both with and without lining), but none of this materials could withstand the corrosion.

Pexgol Solution

The client decided to install a Pexgol pipe 200 mm. The installation was conducted with Plasson HDPE electrofusion technology combined
with butt fusion preparing tools (the butt surfaces of pipes were made plain / the blocking elements of EF couplers were removed – this way the aggresive media could not reach the internal surface of the EF couplers).

The pipe is still working till today withstanding the high corrosive conditions.

Related Case Studies

Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013
Successful outcome in pilot test for SCT Discharge Line with Pexgol.

Advanced piping solutions for handlingscaling fluids

Barrick Gold
Dominican Republic

 | 

2023
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
Replacement of Carbon Steel Pipes by Pexgol for Fire Fighting Network.

Water Transport for Fire Network

Profertil
Argentina

 | 

2022
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018