Concentrated Copper Transportation
Lasta2 Filter Press Feed Lines
Case Study Nº
33
Customer
|
Working Conditions
Pexgol Pipes
Application
Lenght
Categories
The Challenge
BHP used to transport concentrated copper, through a 6” rubber lined carbon steel (RLCS) and HDPE pipes that suffer from constant abrasion and corrosion.
From the maintenance point of view, repeating leaks were consuming too much time from the team, which could be allocated attending scheduled maintenance operations. So, they required a more resisting pipe material.
Pexgol Solution
Short sections of Pexgol pipe 180 mm, Class 15 with Pex-Lined Carbon Steel (PLCS) fittings were provided. The line installation took a day to layout and a day to assemble. The quick and secured flanged couplers allowed the team to work effectively in multiple locations of the line, without depending on a welding machine, or coordinating special safety zones. The line showed no leakage at start up.
Related Case Studies
Dewatering at an Open Cast Mine
|