Meltdown Water Transport
Pipe installation on a mountain
Case Study Nº
16
Customer
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Working Conditions
Complex & harsh ground, 300 m altitude.
Pexgol Pipes
Pexgol 315 mm, Class 15 (SDR 11).
Application
Water transportation.
Lenght
3,300 m.
Categories
The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Related Case Studies
Meltdown Water Transport
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Transport of Compressed Air
Meridian Mine – Faena El Peñón
Chile
|
2018
Fiber Optic Cables Through a Vertical Shaft
Sinohydro
Israel
|
2021
From carbon steel to Pexgol: A victory against corrosion
Profertil
Argentina
|
2021
Cold Water Distribution for External Cooler System
Chip Manufacturer
Israel
|
2022